:以主跨 175 m的 中承式钢管混凝土拱桥一贵阳环城 高速 南环线花溪 I号特 大桥 工程为对 象,对其缆 索吊
装 系统进行有限元计算分析 ,验算主索、扣索 、塔 架、地锚等结构 的安全性 ,并对不满足要求的塔架杆件进行局部
加 强 。
关键词 :钢管混凝土拱桥 ;缆索 吊装 系统 ;计算分析
文章编号 :1009—6477(2010)02—0056—04 中图分类号 :U448.22 文献标识码 :A
Calculation and Analysis of Cable Lifting System in Half-through
Concrete Filled Steel Tube Arch Bridqe
XIANG Zhengsong ,CHEN Bin ,LI Tao ,TIAN Junwei0
Abstract:Aim ing at the hal~through concrete filled steel tube arch bridge with main span of 1 75m Huaxi
No.I Super Major Bridge in south link of Guiyang ring expressway,this paper calculates and analyzes its
cable lifting system by means of the Finite Elem ent M ethod to verify the security of structures such as
m ain cables,gripe cables,pylons and gr ound anchors,etc.,and reinforces locally the pylons and rods
which are not in compliance with the requirements.
Key words:concrete filled steel tube arch bridge;cable lifting system ;calculation and analysis
贵阳花溪 I号大桥是跨越花溪水库的一座特大
桥 ,桥跨布置为 2 X 40 m+12 m+175 m+12 ITI,
主跨 为 12 m+175 ITI+12 ITI中承式钢管混凝土平
行拱桥 ,计算矢高.厂=40,f/L=1:4.375,m=2.2,
拱轴线为悬链线。主桥施工采用无支架缆索吊装斜
拉扣挂悬拼施工工艺 ,每肋分 9段制作安装 ,其中
包括 1.7 m(轴线长 )的拱脚段 、1.935 in的合龙段和
3个普通 吊装段 。全桥拱肋共 有 18个 吊装节段 ,
另外有 9组横撑 吊装节段 ,最大吊重 69.1 t,钢拱
牛 郎 关 岸
肋 总重 1 127.1 t。
整个缆索吊装系统的塔架采用 吊塔与扣塔合二
为一 ,主体结构用 N型万能杆件拼制而成。牛郎关
岸搭设 2座独立的塔架(同岸塔架之间无任何横向联
系 ),塔架高 70、72 m,横 向宽 6 m,纵向宽 4 m,
2座塔架 中心距为 31.5 In,距拱脚中心 60 m;金竹
镇岸搭设 2座独立塔架,高均为 58 m,横向宽 6 m,
纵向宽 4 m,2座塔架中心距为 31.5 m,距拱脚中心
为 38.1 I/!。缆索 吊装系统总体布置见图 1