宝泉抽水蓄能电站上水库主坝和库岸周边采用沥青混凝土面板防渗,库盆底部采用粘土铺盖 防渗,接 头部位形式复杂,施 工难度较 大。因此 ,工程接头部位的施工采用 了国内的柔性滑动止水材 料和特殊的止水结构形式。在施工中遇到 了柔性 滑动材料 的粘结和楔形体填充材料等问题并得 以解 决。相信 ,这对以后类似工程会有实际的借鉴意义。 关键词 :宝泉抽水蓄能电站 ;沥青混凝土面板 ;接头结构;施工技术 中图分类号 :TV743(261) 文献标识 码 :B 文章编号 :1000.0860(2012)07—0059.05 Studyonjointconstructiontechnologyofasphalt-concretefacingforupperreservoirofBaoquan Pum ped StorageHydropower Station YANG W eicai, GUO Huili , GUAN Yushi, ZHANG Fucheng (1.ChinaInstituteofWaterResources& HydropowerResearch,Beijing 100038,China; 2.BeijingInstituteofWater,Bering 100044,China) Abstract:Theanti-seepagesforthemain dam andthesurroundingbank—slopeoftheupperreservoirofBaoquan PumpedStor- ageHydropowerStation are made with theasphalt—concrete facings,while the anti—seepage forthe bottom ofthe reservoiris madewithclayblanket,thusthejointpatternbetweenthem iscomplicatedwithlargerconstructiondificulty.Therefore,the domesticflexible—-slidingwater—·stopping materialand specialwater-·stopping structures are adopted forthe construction ofthe joint.Duringtheconstruction,theproblemsfromboththebondingoftheflexible-slidingwater—stoppingmaterialandthewed— gingfillingmaterial areencounteredandsolved.Itisbelievedthatithasreferencesignificanceforthesimilarpmjectsinthe daystocome. Keywords:BaoquanPumpedStorageHydropowerStation;asphalt—concretefacing;jointstructure;constructiontechnology 1 工程概况 宝泉抽水蓄能电站装机容量 4×300MW,上水 库工程主要包括大坝 、库区防渗 、库底排水、浆砌石 副坝 、排水洞和上库环库公路及边坡工程等组成。主 坝为沥青混凝土面板堆石坝 ,最 大坝高 94.8nl。副 坝为浆砌 石重力 坝 ,坝 顶长度 201.1nl,最 大坝 高 43.9 ITIo 沥青混凝土防渗面板总面积约 1662001TI;沥青 混凝土面板为简式 防渗结构 ,自上而下分别为 2nlm 沥青玛蹄脂 封闭层 ,10cm沥青混 凝土 防渗层和沥 W aterResourcesandHydropowerEngineering Vo1.43 No7 青混凝 土 10em整平胶结层 。面板局部加强部位 的 防渗层结构为 10cm防渗层 、加强网格和 5cm防渗 层 。沥青混凝土 面板 最大 斜 面长 度 约 82m,坡度 1:1.7。 宝泉上水库 主坝和库岸周边采用沥青混凝土面板 防渗 ,库 盆 底 部采 用 粘 土铺 盖 防渗 ,这是 继 美 国 LUDINGTUN工程之后 ,世界上第二个采用此类联合 防渗结构 的工程 。因库岸和坝坡 采用沥青混凝土 防
因本站资料资源较多,启用了多个文件服务器,如果浏览器下载较慢,请调用迅雷下载,特别是超过了5M以上的文件!请一定调用迅雷,有时候速度就会飞起哦,如果您的浏览器自动加载了PDF预览,文件太大又卡死,请按下载说明里的把PDF插件关闭了就可以直接下载,不会再预览了!