摘要:介绍了大岗山水电站泄洪洞洞身边墙和底板硅粉混凝土施工工艺,重点阐述了针对硅粉混凝土温控防裂、
过流面不平整度控制及底板施工排水等难点所采取的工程措施,可为类似工程提供参考和借鉴。
关键词:泄洪洞;硅粉混凝土;温控;平整度;大岗山水电站
Construction Technologies of Silica Fume Concrete for Spillway Tunnel of Dagangshan Hydropower Station
CHEN Xingze, ZHAO Lianrui, ZENG Lu
( Guodian Dadu River Dagangshan Hydropower Development Co. Ltd, Shimian 625409, Sichuan, China)
Abstract: The construetion technologies of silica fume concrete in the side wall and floor of spillway tunnel of Dagangshan
Hydropower Station are introduced, and the temperature cracking control, the flatness control of flow surface and the drainage
in floor conerete construction process are specially presented. The practice can provide references for similar projects.
Key Words: spillway tunnel; silica fume concrete; temperature control; flatness; Dagangshan Hydropower Station
中图分类号: TV544(271)
文献标识码: A
文章编号: 0559-9342( 2015 )07-0077-04
1工程概况
采用双工作面同时作业。全洞混凝土分仓长度除掺
气槽段略短外,其他部位均为9 m,钢筋不过缝。
大岗山水电站泄洪洞工程主要由进口WES实用
经相关试验研究,提出了泄洪洞硅粉混凝土施
根、洞身及出口挑坎组成。其中,洞身总长
工配合比,详见表1。施工时,混凝土采用9 m'罐
1077.50m,采用一坡到底的形式,纵坡坡度i=
车进行运输。
0.103 9。典型衬砌断面为宽14~16 m、高18~21 m
2.2 边墙浇筑
的圆拱直墙形。设置有六级掺气槽,每级间距约
边墙硅粉混凝土除进口0 +00~0+ 150、出口
150m。在校核洪水位下,泄洪洞最大泄洪流量3
1 +018~1 +077.5段采用“满堂脚手架 +组合钢模
352 m'/s, 最高泄洪流速约42 m/s, 泄洪流量及流
板”施工外,其他部位均采用1台液压式自行钢模台
速大,抗冲耐磨要求高。在结构设计中,洞身除顶
车进行浇筑。
拱采用二级配C25混凝土外,边墙拱角1 m以下及
组合钢模浇筑段主要采用P6015、P1015 普通钢
底板均为二级配C。50硅粉混凝土,衬砌厚度1.0~
模板,端头采用P2015钢模板,补缝部位使用木模
1.5 m。
板。模板采用φ14拉筋配合φ48钢管及方木围檁加
固。拉筋与边墙锚杆根部焊接,与模板采用φ24可
2
施工工艺
拆卸式套简螺杆连接。施工时分层浇筑,分层高度
2.1施工方案
控制在3 m以内。采用泵送人仓方式,浇筑上升速
泄洪洞洞身混凝土按照“边墙先行、顶拱跟进、
最后底板"的顺序进行浇筑。其中,边墙、顶拱从出
收稿日期: 2015-05-06
口向进口方向施工,各采用1台边墙台车和1台顶
作者简介:陈兴泽(1986- ), 男,云南蒙自人,工程师,主要
拱台车进行;底板从中间向两端进行全幅浇筑施工,
从事水电工程建设管理工作.