摘要:望京S0H0-T3工程为钢框架钢筋混凝土简体结构,核心简墙体高178.97 mo为确保工期、减轻吊
装压力并方便施工.选用全自动液压爬模和木梁胶合板模板体系。通过制订爬模技术控制要点,取得了施工速
度快,稳定性好,降低成本,安全性高,结构工程偏差小等良好效果。
关键词:超高层建筑;混凝土核心筒;液压爬模
中图分类号:TU 755.2
文献标志码:B
文章编号: 1000 4726(2014)12-1083- -03
KEY POINTS IN TECHNICAL CONTROL OF STEEL FRAME REINFORCED CONCRETE TUBE
HYDRAULIC CLIMBING FORMWORK
LIU Wen-hang, HAO Peng-yuan, MENG De-cai
(eijing Shuangyuan Engineering Consulation & Supervision Co, Lad, 1080, Bejing. China)
Abstract: Wangjing SOHO-T3 projeet is a steel frame reinforced conerete tube structure whose core tube
wall is 178.97 m high. Automatice hydraulie climbing formwork and wooden beam plywod formwork systems are
adopted to ensure the construction schedule, reduce lifting workload and provide convenience for construction.
Key points for technical control of climbing formwork are speeifed, realizing favorable construction ffeets 。
such a8 fast construction, high stability, low construetion cost, high safety and small struetural deflection.
Key words: super high building; concrete core tube; hydraulic elimbing fornwork
望京SOH0- -T3工程为钢框架钢筋混凝土简体结
构,地上45层,双核心筒分左右侧筒(图1),其墙体高
178.97 m。根据本工程的进度要求和结构特点,核心简
混凝土墙体模板采用自动液压爬模系统,核心简外侧
标准大面剪力墙采用ZL -ZPM100型液压爬升模板,内
商采用QPMX50内商悬吊液压爬模架体。部分墙体仅
(a)↓
存在于17层以下,采用由塔式起重机整体吊升的悬臂
支架和井筒平台。
1爬模施工的特点
爬模施工综合了大模板和滑升模板的优点,是一
种适用于高层建筑或高耸构筑物现浇钢筋混凝土结构
(b)
的模板施工工艺。液压自动爬升模板是依附在建筑结
91 双简结构平面示意
构上,随结构施工逐层上升的模板体系。混凝土达到拆
(a)左侧简体: (b)右侧简体
模强度后脱模.模板不落地,依靠液压设备和支承体将
模板和爬模装置向上爬升一层后定位紧固,进行反复
爬升稳定性好;(3)可节省大量工时和材料,降低成本;
循环施工。
(4)液压爬升过程平稳、同步,安全性高;(5)可节省模
目前液压自动爬模工艺已在我国高层建筑施工中
板堆放场地,适合施工场地狭小的城市中心作业;(6)
得到广泛应用,这种工艺具有如下特点:(1)施工速度
结构施工偏差小;(7)可减少模板吊运的吊次,保障超
快,可加快施工进度;(2)既可整体爬升也可单榀爬升,高层项目 中钢构件、压型钢板等的吊装。