摘要:国家会展中心综合体项目展厅区独立结构柱截面大,且柱高达13- 20 m。为保证施工质量和施工进度,工程中
采用了新型操作架体、超高柱垂直度控制、混凝土接缝质量控制等关键施工技术。从拆模后的实际效果来看,超高柱
的混凝土浇筑质量得到了保证,满足规范要求,可供相关工程参考。
关键词:国家会展中心超高柱重直度控制 模板拼缝 混凝土浇筑
中图分类号: TU756.41
文献标识码: B
文章编号: 1004-1001(2014103-0248-03
Construction Technology of Super Tall Concrete Columns
for China Expo Complex
Chen Xinxi Ge Jie Chen Hua Dai Yaojun Zhi Xiaoxiang
General Contractor of China Construction Eighth Engineering Division Co. Ltd.
Shanghal 200135
Abstract: In China Expo Complex project, the independent structural columns have large Cross sections, and each
column height reaches 13-20 m. In order to ensure the construction quality and the construction schedule, several key
construction technologies such as the new type operation frame; the verically control over the super tall columns; and
the qualty control over the concrete joints were used. The pracical results after remowal of the frmwork showed that the
concrete pouring qualty of super tall columns can be guaranteed and met the current speication requirements, which
can be used as a reference for similan projects.
Keywords: China Expo Complex super tll concrete column vericalty control forwork joint concrete pouring
工程概况,
C1区展厅的一层混凝土柱在梁底以下部分净高为
中国博览会会展综合体项目(北块)位于上海
13 m,柱子截面尺寸为1 800 mmx1 800 mm;二层独
市西部,总建筑面积约147万m2,其中地上建筑面积
立柱高度为13~ 20m不等,柱子截面尺寸为1500 mmx
127万m2、地下建筑面积20万m2,建筑高度43m。其中,
1 500 mm。
C1区为会展展厅部分,建筑面积20万m',展厅区2层,后
由于混凝土结构柱高度高、截面大、数量多,施工中
部辅楼6层,建筑高度为43 m。C1区在本工程中的分布如
要保证施工质量和施工进度,难度较大。本文重点介绍了
图1所示。
操作架体选用、垂直度控制、混凝土接缝处理等方面的关
键施工技术。
2施工流程与安排1-31
2.1 平面施工区段划分及施工流向
超高独立柱在施工时作为独立的施工区域组织施工,
并采取分段组织、流水施工,从北向南6-8根柱子为一
组,共分为6个区段进行施工,分段施工平面如图2所示。
由于展厅在平面上分为东西2个展区,施工时柱子分为2个
区,将每个区东西向轴线的3个柱子分为1个组,共6组,
图1工程整体分区
施工时从北向南流水施工。
2.2 施工缝留设
作者简介:陈新喜(1973-) ,男,研究生,高级工程师。
由于柱子超高,为确保混凝土的施工质量,将柱子分
通讯地址:上海市浦东新区源深路269号(200135)。
2次施工,施工缝留设在标高7.2 m处。超高柱竖向施工缝
收稿日期: 2014-01-09
留设示意如图3所示。
因本站资料资源较多,启用了多个文件服务器,如果浏览器下载较慢,请调用迅雷下载,特别是超过了5M以上的文件!请一定调用迅雷,有时候速度就会飞起哦,如果您的浏览器自动加载了PDF预览,文件太大又卡死,请按下载说明里的把PDF插件关闭了就可以直接下载,不会再预览了!